<del id="pnlnp"></del>
<track id="pnlnp"><strike id="pnlnp"><strike id="pnlnp"></strike></strike></track>

<noframes id="pnlnp">

<pre id="pnlnp"><strike id="pnlnp"></strike></pre>

    <track id="pnlnp"><strike id="pnlnp"><ol id="pnlnp"></ol></strike></track>

    <track id="pnlnp"><strike id="pnlnp"></strike></track>

    <pre id="pnlnp"></pre><track id="pnlnp"><strike id="pnlnp"><strike id="pnlnp"></strike></strike></track>

      <noframes id="pnlnp">
      
      

      <track id="pnlnp"></track>

        <big id="pnlnp"><strike id="pnlnp"></strike></big>
            <pre id="pnlnp"></pre>

                <track id="pnlnp"></track>

                  <track id="pnlnp"><strike id="pnlnp"></strike></track>

                  <noframes id="pnlnp"><pre id="pnlnp"><ruby id="pnlnp"></ruby></pre>

                    <track id="pnlnp"><span id="pnlnp"><rp id="pnlnp"></rp></span></track>

                    珠海市日新化妝品有限公司

                    珠海市日新化妝品有限公司中國化妝品OEM代加工行業實力廠家現代化研發中心 | GMPC無塵車間 | 萬余平方米大型加工廠

                    4008229002

                    熱搜關鍵詞: 服務保障 資質榮譽 展廳風采

                    化妝品OEM代加工的產品生產周期是多久?

                    返回列表 來源:珠海市日新化妝品有限公司 發布日期:2020-01-07 13:56:15

                            產品備案和包材到廠不是化妝品OEM工廠能決定的,產品備案會涉及到備案機構的工作流程,而且也跟其他產品備案數量多少有關,一般時間需要15天內。而包材是除了產品的原料以外的包裝材料,比如瓶子、內托、外盒子等,這些到化妝品OEM廠家時間是根據包材廠家的實力、包材的數量、包材的印刷要求等決定,每個不同材質和印刷的包材生產貨期也不一樣,一般包材單獨生產貨期在12天-30天不等。

                          等備案通過,包材到廠后,化妝品OEM工廠就會開始包材檢測、原料乳化、產品灌裝包裝等生產環節,基本上化妝品OEM廠家生產產品的周期的為包材檢測通過后的15天后交貨。

                    版權所有http://www.j4097.cn(珠海市日新化妝品有限公司)轉載請注明

                    【相關推薦】
                      暫無信息

                    珠海日新資訊中心

                    免費指導免費寄樣

                    3000多款化妝品成熟配方4008229002

                    • *

                    • *

                    點擊取消
                    国产精品性色AV